Digital Systems Portal

Power Your
Workflow.

The official digital portal of Leyte III Electric Cooperative — centralizing document tracking and overtime management for maximum operational efficiency.

0
Consumers
0
Districts
0
Systems
24/7
Uptime
Scroll
Platform Features
Integrated Systems

Your Workplace,
Streamlined.

Access LEYECO III's core management platforms built for efficiency, transparency, and accountability.

01
Document Tracking

Document Tracking System

A centralized platform to manage, route, and monitor official documents across all departments — ensuring accountability and real-time visibility.

  • End-to-end document lifecycle management
  • Department routing and live status tracking
  • Audit trail and approval history logs
  • Search, filter, and archive capabilities
  • OTP-based secure password recovery
Open System
02
Overtime Management

Overtime Request System

A streamlined digital workflow for submitting, reviewing, and approving overtime requests — reducing paperwork and ensuring fair workforce management.

  • Online OT request submission and approval
  • Multi-level authorization workflow
  • Overtime summary and payroll reporting
  • Calendar view of scheduled overtime
  • Face recognition login support
Sign In
About LEYECO III

Energizing Communities

The Leyte III Electric Cooperative (LEYECO III) is a non-profit, member-owned electric cooperative operating in the province of Leyte, Philippines. Under the National Electrification Administration (NEA), LEYECO III is committed to providing reliable, affordable, and safe electricity to residential, commercial, and institutional consumers across its franchise area.

This digital portal centralizes key administrative systems to support operational excellence, workforce efficiency, and transparent governance — developed by our dedicated OJT interns.

140K+
Consumers
5
Districts
24/7
Service
NEA
Certified
Cooperative Profile

About LEYECO III

Leyte III Electric Cooperative, Inc. (LEYECO III) is one distribution utility that caters to the electrical needs of 285 barangays with nine (9) municipalities namely Carigara, Capoocan, Tunga, Barugo, San Miguel, Jaro, Alangalang, Santa Fe, and Pastrana with an area of 1,965 Square Kilometers. Serious in realizing its dream of providing a reliable and efficient service to its member-consumers having a population 273,000 on year 2024 based on statistics.

The Leyte III Electric Cooperative, Inc., situated at Tunga, Leyte is an electric cooperative organized and registered as private entity with the National Electrification Administration (NEA) as required by PD 269, as amended, or Republic Act No. 6938, to supply electricity to end-users within its franchise area that will end by September of year 2029.

Leyte III Electric Cooperative, Inc. (the "Cooperative") is a member-owned non-stock, non-profit cooperative. The Cooperative was incorporated to primarily engage in buy and sell, supply, promotion, and encouragement to the fullest use of electric service to its members on area coverage basis.

LEYECO III is of the basic line and staff type. At the top of its hierarchy are the member-consumers who elect the Board of Directors (BOD), the policy-making body of the Cooperative. The Board is composed of nine Directors and a General Manager (GM) who act as ex-officio member and sits on top of operations. The nine members of the Board represent the different municipalities covered by LEYECO III and who are elected by their respective constituents for a term of three years.

285
Barangays
9
Municipalities
1,965
Sq. Kilometers
273K+
Population Served
LEYECO III — Franchise Area Map
LEYECO III Franchise Area Map